Attention of solenoid valve installation

1. When installing, pay attention to the arrow on the valve body should be consistent with the medium flow direction. Do not install in a place with direct dripping or splashing water. The solenoid valve should be installed vertically upwards;

2. The solenoid valve should ensure normal operation within the fluctuation range of 15% -10% of the rated voltage;

3. After the solenoid valve is installed, there must be no reverse pressure difference in the pipeline. And it needs to be powered on several times, so that it can be officially put into use only after it is at a proper temperature;

4. Thoroughly clean the pipeline before installing the solenoid valve. The incoming medium should be free of impurities. Filter is installed before the valve;

5. When the solenoid valve fails or is cleaned, a bypass device should be installed to ensure the system continues to run.